LaneHarvest
Height checked first

Step deck dispatch for the freight that's too tall for a flatbed

Your lower deck is your edge. We look for machinery, equipment and tall freight that only fits under legal height on a step deck, check the height against the route before the load reaches you, and negotiate tarp pay and the extras up front.
5% of gross for one truck with authority older than 6 months. Every load comes to you first.

Load offer · 48 ft step deck with ramps

Fort Wayne, IN Louisville, KY

EXAMPLE
RATE
$980
MILES
215+18
ALL-IN RPM
$4.21
  • Freight: Packaging machine, 10 ft 2 in tall, 24,000 lb
  • Pickup: Wed 07:00 · Deliver: Wed 15:00
  • Tarp pay $100
  • Detention $75/hr after 2 hrs

Height check

Will this load fit under the limit?

Pick your trailer, then slide the load height. The check adds your deck height and compares the total with state height limits, which range from 13.6 to 14.6 feet because there's no federal limit. It's the first question we answer about any tall load, before rate.

under every state's standard limit
Total height
13 ft 2 in
Clearance to 13 ft 6 in
0 ft 4 in

Deck heights are typical values; measure your own trailer. No federal height limit exists; states set limits from 13.6 to 14.6 ft (FHWA). Bridges and wires on a route can be lower than the state limit.

Source: FHWA, October 2026

State limits are only the start. A low bridge, an overpass under construction or a power line on a rural road can be lower than the limit, so tall loads near the top of the range get a route check too. A few inches of difference between trailers is often what decides whether a load is routine or needs a permit.

Step deck dispatcher

Freight we find for step decks

Step deck freight is mostly about height and loading method. These are the groups we work most, and what each needs from your trailer.

  • Machinery

    Packaging lines, presses, generators and plant equipment that's too tall for a flatbed but within legal height on a lower deck.
  • Drivable equipment

    Skid steers, compact tractors and small machines that roll on with ramps instead of a crane.
  • Tall crates and components

    Crated equipment, HVAC units and industrial components that need extra headroom.
  • Agricultural equipment

    Implements and machines moving between dealers and farms, busiest around planting and harvest.
  • Construction equipment

    Smaller equipment and attachments between rental yards, dealers and job sites.
  • Conestoga freight

    High-value or weather-sensitive freight that benefits from a rolling tarp enclosure.

Conestoga dispatch

Conestogas: flatbed access, van protection

A Conestoga's rolling tarp system slides back to load from the side or top like a flatbed, then closes to protect the freight like a van. That makes it a strong fit for freight that hates weather and can't be loaded through rear doors.

  • No tarping at the dock

    The system covers the load, saving time and the physical work of throwing tarps.
  • Protected freight

    Machinery, steel and finished goods stay dry and clean, which shippers will often pay for.
  • Higher equipment cost

    The trailer costs more and weighs more, which cuts payload. The rate has to cover both.

Run a Conestoga? Tell us its interior height and width, because those, not the deck height, decide which tall loads fit.

Ramps and loading

Ramps, winches and how the load gets on

How a load gets on and off your deck matters as much as whether it fits. A machine that needs a crane at a site without one is a wasted trip.

Ramps

Let drivable equipment roll on and off. Opens a large share of step deck freight that flatbeds without ramps can't take.

Winch

Pulls non-running equipment up the ramps. Needed for dead machines and some vehicles.

Crane or forklift

Most heavy machinery loads this way. We confirm the equipment exists at both ends before you accept.

Pick the right deck

Step deck vs flatbed vs RGN

Each open deck wins different freight. Knowing where yours fits keeps you out of loads that need another trailer.

Flatbed

Most freight and most brokers: steel, lumber, building materials. Tall loads run over height fast.

Step deck

Tall freight within legal height, drivable equipment with ramps. Fewer loads, often better pay.

RGN / lowboy

The tallest and heaviest equipment, often under permit. More planning, higher rates.

See flatbed dispatch and oversize and heavy haul dispatch for those trailers.

Step deck rates

What moves a step deck rate

Step deck rates often run above flatbed because fewer trucks can take the freight, but that premium depends on the load.

  • Height

    Loads that truly need the lower deck pay for it. Loads that would fit a flatbed pay like flatbed loads.
  • Loading time

    Machinery loads with rigging can take hours. That time belongs in the rate or in detention terms.
  • Permits

    Slightly over-width loads need permits and more planning. The rate should cover the extra days.

The other lever is the reload. Machinery often ships from industrial areas into job sites and farms that don't ship much back. We look at what leaves the delivery area before you accept, and when the honest answer is a flatbed load home, we price that leg into the decision instead of leaving you to find it after you unload.

Before you accept

The step deck load check

Tall freight fails on details. Tap through the checks we run on every load's details before it reaches you.

Step deck load check

1/5 CHECKED

  1. Confirmed by the shipper for the machine as it will ship, including anything bolted on.

Securing machinery

Chains, binders and the rules for heavy equipment

Most step deck freight is heavy and top-heavy, which makes securement the part of the job that can't be rushed. The federal minimums are the floor: the aggregate working load limit of all tiedowns must be at least half the cargo weight, and minimum tiedowns by length: one for articles 5 ft or shorter weighing 1,100 lb or less, two up to 10 ft, plus one for each additional 10 ft or part of it. Machinery and heavy vehicles have their own extra rules on top, so check the regulations for the specific equipment.

Before a machinery load reaches you, we ask the shipper for the weight, tie-down points and any blocking it needs, so you know what to bring. Plan the count with the securement calculator on the flatbed page, then inspect within the first 50 miles and at every stop after.

Source: FMCSA cargo securement rules, 49 CFR 393.110, October 2026

Avoid these

Where step deck owners lose money

  • Trusting the listed height

    A machine listed at 10 ft can be 10 ft 8 in with its exhaust stack. Measure before you load.
  • No crane at the delivery

    Arriving with a machine and nothing to unload it with turns into a layover nobody priced.
  • Tarping machinery for free

    Machinery tarps are heavy and awkward. If tarps are required, tarp pay should be on the rate con.
  • Taking flatbed freight at flatbed rates

    Your lower deck has value. Fill gaps with flatbed loads, but don't let them crowd out the tall freight that pays more.

The step deck year

When step deck freight moves

Equipment moves with the seasons that use it. Agricultural machines move ahead of planting and harvest, construction equipment picks up as building season starts, and plants schedule installs and upgrades around their own slow periods. In colder states, winter can thin out construction loads while manufacturing freight keeps going. We plan ahead for the slow months so your lower deck isn't sitting empty waiting for spring.

Getting set up

What brokers check on a step deck carrier

Equipment shippers want to know your deck can take their machine before they tender it.

  • Upper and lower deck lengths and the lower deck height
  • Ramps, winch and their capacity
  • Chains, binders, straps and tarps on board
  • Cargo coverage sized to the equipment's value
  • Experience with machinery and permitted loads
  • Photos of past secured equipment loads

EXAMPLE week

What a step deck week can look like

An illustration of a Midwest week mixing machinery and drivable equipment, not a promise of lanes or rates.

Weekly settlement

EXAMPLE
EXAMPLE step deck week. Extras are tarp pay and detention.
LaneLoadedEmptyLinehaulExtras
Fort Wayne, IN > Louisville, KY21518$980$100
Louisville, KY > Nashville, TN17512$720-
Nashville, TN > Indianapolis, IN29020$1,100$150
Indianapolis, IN > Fort Wayne, IN1258$560-
GROSS
$3,610
ALL-IN RPM
$4.18
FEE 5%
$181
YOU KEEP
$3,430
EXAMPLE step deck week. Extras are tarp pay and detention.

Your call, every load

How a step deck load reaches you, and what it costs

Every load comes to you with the commodity, dimensions, weight, loading method, tarp needs, times and pay. You say yes or no; nothing is booked without your yes. On a yes, the broker emails the rate confirmation to you. The fee is 5% of gross for one truck with authority older than 6 months, 7% for newer authorities and 4% for fleets. EXAMPLE: a $6,500 week costs $325.

Check axle weights with the axle weight calculator, compare fees on the pricing page, or read dispatch for a new MC.

Step deck dispatcher: straight answers

Q01What freight needs a step deck?
Freight that's too tall for a flatbed but fits within legal height on a lower deck: machinery, equipment, tall crates, some building components and vehicles. The lower deck sits closer to the ground, so total height stays under the limit. Ramps also let drivable equipment roll on instead of needing a crane or forklift.
Q02Do Conestogas get better rates?
Often, because a Conestoga's rolling tarp system protects freight that would otherwise need tarping, and fewer carriers run one. Shippers with high-value or weather-sensitive freight like the protection and the faster loading. The premium varies by lane and season, and the trailer costs more to buy and maintain.
Q03Can you dispatch a step deck with ramps?
Yes. Ramps open drivable equipment like skid steers, tractors and small machines, which is a big share of step deck freight. Tell us your ramp setup and any winch, and we search for loads that use them. Loads that need a forklift or crane at both ends are matched to sites that have them.
Q04Do you handle oversize permits?
On request, yes. Step decks often carry loads that are slightly over width, which need permits in every state on the route. We coordinate the permits and plan around travel windows; the permits are issued to your company and you follow their conditions on the road.
Q05Can a new MC get step deck loads?
Yes, though some equipment shippers want experience first. New authorities pay 7% for the first 6 months, then the standard rate. We start with brokers that onboard new carriers and build history with clean securement, good photos and on-time deliveries.
Q06How much does step deck dispatch cost?
5% of gross on loads you haul for one truck with authority older than 6 months, 7% while your MC is newer, and 4% per truck for fleets of two or more. No setup fee, no minimum and no contract beyond 30 days notice.

Tall freight, your lower deck, your call.

Apply in about 2 minutes.