Dump truck dispatch that keeps your truck working every day
HOURLY
$1,100
10 hrs x $110
PER TON · BEST FOR THIS JOB
$1,296
8 loads x 18 t x $9
PER LOAD
$1,280
8 loads x $160
- Loads per day
- 8
- Tons moved
- 144
Rates are your inputs. Short cycles usually favor per-load or per-ton pay; long waits at the pit or the site usually favor hourly.
Start with the comparer above. Put in the tons your truck carries, the round trip from pit to site, and the hours you'll be on the job, then the three rates a job might offer. It shows what each pay model earns on the same day. Short cycles usually favor per-load or per-ton pay, while long waits at the pit or a slow site usually favor hourly.
That's the first question we ask about every dump truck job, before a single call to the contractor. The same tonnage can pay very differently depending on how the job is priced and how long the line is at the scale.
Job-ready checklist
What contractors check before you roll onto a site
Construction sites and plants have their own rules on top of DOT rules. Missing one item can keep your truck at the gate. Tap through the list; we confirm each with the job before it reaches you.
Dump truck job-ready
1/6 CHECKED
Contractors often want higher liability limits than your filing minimum and may want to be named as additional insured. A certificate in hand saves a wasted morning.
Active authority and USDOT number for interstate or for-hire work, plus any state permits the job requires.
Many states require loose loads to be covered. A broken tarp can get you turned away or fined.
Load and scale tickets are how you get paid. Know which system the job uses before the first load.
Hard hat, vest, boots and anything the site lists, plus any site orientation they require.
Which gate, what time, and who to check in with. Sites start early and lines form fast.
Dump truck dispatcher
Work we find for dump trucks
Dump work clusters around a few kinds of jobs. Each has its own rhythm, pay model and season, and a good week usually mixes more than one.
Aggregate hauling
Stone, sand and gravel from quarries and pits to plants, yards and job sites. Often per ton, with scale tickets at both ends.Asphalt and paving
Hot mix from the plant to the paver on a tight cycle. Usually seasonal and hourly, with long days in peak months.Site work
Dirt in and out for new construction, grading and excavation. Volume can run for weeks on one site.Demolition
Debris hauled to landfills and recyclers. Often runs year-round when other work slows.Municipal and road work
City, county and state projects with steady schedules and paperwork to match.Snow and seasonal
In some regions, winter work like salt hauling fills the slow months for trucks set up for it.
End, side or belly
End dump, side dump, belly dump: the work each body opens
End dump
The most versatile. Handles most aggregate, dirt and demolition work, but tipping high needs firm, level ground and clearance overhead.
Side dump
Unloads quickly to the side without raising the bed high, which suits soft ground, overhead lines and fast cycles.
Belly dump
Drops material through the bottom in a windrow while moving. Built for road base and paving work on open highway jobs.
Tell us your body, axle setup and what you carry, and we only bring jobs your truck can actually do. Tri-axles and quads open different weight and site options, so the setup matters as much as the body.
EXAMPLE day
What a dump truck day can look like
An illustration of a site-work day for a tri-axle, not a promise of hours or pay. The point is where the time goes, and why the pay model matters.
05:30
Check in at the gate, site orientation if it's day one
06:00
First load at the pit, scale ticket in hand
06:00-14:30
Cycles between pit and site, about 75 minutes each
11:00
Line at the scale adds 20 minutes to a cycle
15:00
Time sheet signed, tickets photographed and sent
On a per-load job, that 20 minute scale line costs you money. On an hourly job, it doesn't. That's why we ask about lines, gates and site speed before a job reaches you.
Who you haul for
Contractors direct or material brokers?
Dump work comes from two directions, and both are worth having in the mix.
Contractors direct
General contractors, excavators and paving companies hiring trucks for their own jobs. Often better rates and repeat work once they trust you, but they expect you on time every morning and they pay on their schedule.
Material brokers
Brokers who sell material and arrange trucks to deliver it, or who supply trucks to contractors. Easier to get into, with a steady stream of jobs, but they take a margin. Read their payment terms and ticket rules closely.
Whichever side a job comes from, we check three things before it reaches you: who signs your tickets, when they pay, and what happens if the site shuts down for weather after you've rolled. A clear answer on all three is worth more than a slightly higher rate from someone who won't give one.
Steady or spot
Steady contracts vs spot jobs
Both have a place. The right mix depends on how much you want to plan ahead and how much you want to chase the best day rate.
Steady contracts
Weeks of work on one site or a paving season with one contractor. The rate may be a little lower, but the truck works every day and you know where it'll be. Good for covering fixed costs reliably.
Spot jobs
One-day or short jobs, often at better rates when contractors are short on trucks. More variety, more calls, more gaps. Good for filling days around steady work.
Many owners hold one steady contract and fill the gaps with spot work. We look for both and show you the tradeoff in real numbers before you commit to either.
A steady contract also makes it easier to add a second truck later, because you already know there's daily work for it. Once you run two or more trucks, each one drops to the 4% fleet rate, and the desk can split jobs between them so neither sits while the other works overtime.
Getting paid
Tickets are your paycheck: keep every one
Dump truck pay lives on paper. Load tickets, scale tickets and daily time sheets are what contractors pay against, and a missing ticket can mean a missing load on your invoice.
Scale tickets
Weight in and out at the pit or plant. Per-ton jobs pay from these.Time sheets
Start, breaks and finish, signed on site. Hourly jobs pay from these.Load counts
Loads delivered per day, matched to tickets. Per-load jobs pay from these.
We collect copies at the end of each day, match them to the job, and send the invoice paperwork so payment isn't held up by a missing slip.
Avoid these
Where dump truck owners lose money
Missing tickets
One lost scale ticket can mean one unpaid load. Photograph every ticket the moment you get it.Taking per-load pay on a slow site
Long lines and slow loaders turn a good per-load rate into a bad day. Ask about cycle times first.Showing up without the right certificate
No additional-insured certificate, no gate entry. Send it before the first day.Waiting for winter to look for winter work
By the time paving stops, the steady winter jobs are taken. Plan a month ahead.
Plan the year
Is dump truck work seasonal? Plan for it
In colder states, paving and much site work slow down in winter when asphalt plants close and ground freezes. In warmer states work can run most of the year. Either way, the slow season shouldn't surprise you.
We start looking for winter work, like demolition, municipal jobs or seasonal hauling your truck is set up for, before the busy season ends. If the truck will sit, you know early enough to plan maintenance or time off instead of losing weeks waiting for a call.
Weather matters day to day too. Rain can shut down a dirt job for days while a paving crew waits for dry ground. When a site calls off, we look for a same-day replacement, like a demolition haul or a yard-to-yard aggregate move, so a rained-out job doesn't become a lost day.
You approve every job
Every job is your call
Each job reaches you with the site, material, pay model and rate, start time, expected hours and any site rules. You say yes or no; nothing is committed without your yes. Rate confirmations and job agreements go to you, not us.
The fee is 5% of gross on jobs hauled once your authority is older than 6 months, 7% before that, and 4% per truck for fleets. EXAMPLE: a $1,500 day costs $75. No minimum and no charge for days the truck sits.
Check your truck's capacity with the dump truck capacity calculator, compare fees on the pricing page, run your costs in the cost calculator, or read dispatch for a new MC.
Dump truck dispatcher: straight answers
Q01How much does dump truck dispatch cost?
Q02How much can my dump truck carry?
Q03Do you dispatch end dumps and side dumps?
Q04Is dump truck work seasonal?
Q05What insurance does a dump truck need?
Q06Can you find steady dump truck contracts?
Keep your dump truck on the job.